OnlineCBT Logo OnlineCBT

Current Affairs · 2026-08-24

हिन्दी

What technology readiness level (TRL) was validated by D-Propulse Aerospace during the successful demonstration of its 5 kN air-breathing RDE integrated with an aerospike nozzle?

  1. TRL-3
  2. TRL-5
  3. TRL-7
  4. TRL-9

Correct answer · Option 2

TRL-5

Explanation

The test successfully validated Technology Readiness Level-5 (TRL-5) at the DRDO test facility in Hyderabad.
पता संपर्क करें

+91 7877547686

ई-मेल

onlinecbtportal@gmail.com

हेल्पलाइन नंबर

+91 7877547686


डाउनलोड करने के लिए क्लिक करें
Get it on Google Play

ऐप डाउनलोड करने
के लिए Google Play पर
उपलब्ध है

WhatsApp Chat