OnlineCBT Logo OnlineCBT

Current Affairs · 2026-08-04

हिन्दी

How is the total debt facility for the Meja Thermal Power project expansion funded between REC Limited and PFC Limited?

  1. REC 60% : PFC 40%
  2. REC 50% : PFC 50%
  3. REC 70% : PFC 30%
  4. REC 40% : PFC 60%

Correct answer · Option 2

REC 50% : PFC 50%

Explanation

The total debt facility is funded equally (50:50) between REC Limited and PFC Limited.
Address Contact

+91 7877547686

E-mail

onlinecbtportal@gmail.com

Helpline Number

+91 7877547686


Click To Download
Get it on Google Play

ऐप डाउनलोड करने
के लिए Google Play पर
उपलब्ध है

WhatsApp Chat