What is the total expected green power generation output from the integrated waste-to-energy projects in Haryana signed by OIL Green Energy?

  1. 20 MW
  2. 50 MW
  3. 100 MW
  4. 150 MW

Correct answer · Option 2

50 MW

Explanation

The facilities are expected to produce 70–75 TPD of Compressed Biogas and around 50 MW of green power.