हिन्दीWith which company was the LAToT signed for the fabrication and commissioning technology of the LM2500 Gas Turbine?
Correct answer · Option 2
Vertex Engineering Systems Private Limited
Explanation
The technology for LM2500 Gas Turbine was transferred to Vertex Engineering Systems Private Limited, Hyderabad.